Table of Contents
- What Is a Bill of Materials (BOM)?
- Key Takeaways
- Exploring Different Types of Bills of Materials
- How to Effectively Use a Bill of Materials
- Important
- Understanding BOM Displays: Explosion vs. Implosion
- What Is a Bill of Materials Used for?
- What Is Product Lifecycle Management?
- What Are the Key Components of a BOM?
- The Bottom Line
What Is a Bill of Materials (BOM)?
Let me explain what a bill of materials, or BOM, really is—it's your comprehensive blueprint for constructing, manufacturing, or repairing a product, detailing the raw materials, components, and step-by-step instructions you need for efficient production.
You place the finished product at the top, followed by its individual components and materials, making the BOM a centralized source of information. In the engineering phase, an engineering BOM charts the course for design, while a manufacturing BOM guides the assembly process.
Key Takeaways
A Bill of Materials (BOM) is a comprehensive list essential for building, manufacturing, or repairing a product, specifying raw materials, components, and instructions. BOMs are crucial for both engineering design and manufacturing, as they ensure an efficient assembly process by detailing every required part and component.
Accurate BOMs help in reducing waste, streamlining production, and ensuring necessary parts are available, thus avoiding costly production delays. BOM displays come in two formats: explosion displays break down assemblies into individual components, while implosion displays aggregate parts into their overarching assemblies. BOMs play a pivotal role in inventory management and production scheduling within enterprise resource planning (ERP) and materials requirement planning (MRP) systems.
Exploring Different Types of Bills of Materials
An engineering BOM defines the design of a finished product, commonly based on a computer-aided design (CAD) drawing—keep in mind that more than one BOM may be created as part of product lifecycle management.
A manufacturing BOM lists all assemblies and parts required to complete all manufacturing activities to make a finished item, and it also defines the required packaging materials to send the product to the customer.
How to Effectively Use a Bill of Materials
Manufacturers start the assembly process by creating a BOM, which acts as a centralized source of information listing the items and instructions needed to create a product.
Each line in a BOM details the product code, part name, number, revision, description, quantity, unit measure, size, length, weight, and specifications—it also lists alternative and substitute parts and parts noted in drawings.
Creating an accurate bill of materials ensures that parts are available when needed and that the assembly process is efficient. An inaccurate BOM can cause production delays if time is required to locate missing parts, which increases operating costs.
Important
Manufacturing BOMs are crucial for ERP and MRP system design.
Understanding BOM Displays: Explosion vs. Implosion
A BOM displays its information in one of two ways: an explosion display or an implosion display. An explosion display breaks down an assembly into its individual parts, while a BOM implosion display links the lower-level parts to an assembly at the higher level.
For example, a computer is exploded into hard drives, chips, random access memory panels, and processors. Each processor is then exploded into an arithmetic unit, a control unit, and a register. The requirements for the arithmetic unit, control unit, and register are imploded into the requirements for the processor, which are imploded into the requirements for the computer.
What Is a Bill of Materials Used for?
A BOM shows how finished products relate to their components—it's useful for estimating materials and costs, planning purchases, ensuring parts are available, and avoiding delays.
What Is Product Lifecycle Management?
Product lifecycle management covers designing, developing, producing, and disposing of products.
What Are the Key Components of a BOM?
A BOM should list the product name, required raw materials with quantities and units, sub-assemblies, part numbers and descriptions, unit costs, and product quantity.
The Bottom Line
A bill of materials is an important part of the engineering and manufacturing process that lists the parts and materials required to build a product. An accurate BOM helps reduce waste, streamline production, and ensure the availability of necessary parts. Bills of materials help companies manage their operations costs.
Other articles for you

Consumerism is the idea that increasing consumption of goods and services boosts happiness and economic growth, though it has notable drawbacks like environmental harm and social issues.

Pivot points are technical analysis tools that help traders identify support and resistance levels based on previous price data to guide trading decisions.

A deed of reconveyance transfers property title back to the borrower after fully paying off a mortgage.

A market is a venue where buyers and sellers exchange goods and services, influenced by supply and demand.

An IRA is a tax-advantaged retirement savings account with various types like traditional, Roth, SEP, and SIMPLE, each offering different rules for contributions, taxes, and withdrawals.

Market research is the process of gathering and analyzing data to inform product strategies and understand consumer needs.

Supply chain finance is a technology-driven approach that reduces costs and improves efficiency in transactions between buyers and sellers by optimizing working capital and providing short-term credit.

Earnings per share (EPS) is a key metric that measures a company's profitability by dividing net income by outstanding shares.

The Securities Act of 1933 is federal legislation aimed at protecting investors through transparency and anti-fraud measures in securities markets following the 1929 crash.

A loan loss provision is an expense banks use to cover potential losses from unpaid loans and maintain accurate financial reporting.